1

Creating a workout from the Calendar view (Read 432 times)

SkunkConn


    Eric I saw that you have added the ability to do this, but when I click on say Dec. 12th 2008, it populates with today's date in the new workout. I do like the "jump to" feature much better then before, but I would really love to be able to create workouts from the calendar and it populate the date with the actual date that I click on. Thanks Brandon
    Trent


    Good Bad & The Monkey

      I just gave this a try, and it did populate the date of the day I clicked on (1-15-09, and 1-16-09).

      Ricky

      —our ability to perform up to our physiological potential in a race is determined by whether or not we truly psychologically believe that what we are attempting is realistic. Anton Krupicka

      eric :)


        This is a bug. I'll have it fixed soon.
        SkunkConn


          Great, Thanks!!