Run: Long Previous Next

1/9/2011

13.3 mi

1:30:40

6:50 mi

Notes

This was a real quality long run. A little sore, but quality. Moe complemented me.

-

Lt. Cmdr. Lefler reports that repairs to the magnetic interlocks are progressing nicely. However, repairs to the microfractures in the bussard collectors casings are still required. Should be largely repaired by 15:00 tomorrow.

Comments